Jiangsu Vocational College of Finance and Accounting Vocational College of Trial of the use of existing construction management
Author:  Release time: 2023-08-25   Views:10

Jiangsu Caixing Vocational College of Formation of the Handling Management Measures (Practice

sky bet login

The first article   School existing buildings are an important part of school assets,It is the basic material condition for school construction and development。To further strengthen the management of the sky bet games online school's existing buildings,Improve the management system of existing buildings,Reasonable use of resources,better teaching、Scientific Research and Teachers and Students and Employees,According to the "Implementation Measures for the Management of State -owned Assets Management in Jiangsu Province"( Sujiao Cai[2020] 6No.)Notice of the Provincial Department of Education on Further Strengthening the Safety Management of Education Systems in the Provincial Education System "( Soviet religion sent a letter[2021] 78No.)Requirement combined with the actual situation of our schoolFormulate these measures.

Two  The existing buildings in these measures refer to the possession of the school、Used according to law is recognized as all kinds of public houses and structures in the country, as well as all kinds of rooms purchased by the school。

Article 3  SchoolA neighborsUse andManagementThe following principles should be followed:

1.Observe the country、Provincial、Municipal relevant safety management law、Sky bet app download Regulations and school safety management of various rules and regulations,Guaranteed teaching、Scientific Research、The overall cultural environment of the campus and the normal life order of teachers and students

2.According to the "Who is in charge and who is responsible、Who owns who is responsible、Who uses who is responsible for ",Fully compact the responsibility of using the security subject,Strictly prevent building safety accidents。

3.Improve utilization, resource sharing principle.

Chapter 2 Management system and responsibilities

Article 4  Schools with existing buildings implement unified leadership in accordance with different use nature,Standard、Hierarchical management。The person in charge of each batch unit or actual use unit is the first responsible person in the construction of the building in this area。

Article 5  The existing management of the existing buildings.

All departments、The college has the right to use and manage the public houses and structures used and occupied by the college。

1.The school's party and government office houses include the office of the party and government functions of the school organs、Receiving Room、Secret Room、File Room、Conference room, etc.,State management from the school office。

2.Classrooms include various ordinary classrooms、Stagencies Classroom、Microcarmark、Multimedia Classroom、Voice Classroom、Training base (classroom) and its subsidiary houses,Study by the Academic Affairs Office。

3.College Party Government、Teachers and experimental technical personnel office houses、Sky bet app download Experimental training rooms belonging to each college and the school approved by the collegeHis room is managed by the colleges.

All kinds of teaching、Student training venues except the directly managed by the college,It should also accept the unified coordination management of the Academic Affairs Office or the Smart Campus Center in accordance with the main use direction。

4.Student dormitory house and its subsidiary room,Management of the Student Work Office。

5.Transformer、Boiler room、Student cafeteria、Outside school talent room、Training Center Hotel and other rental houses,Study management from the Logistics Management Office。

6.Book Information Building (Except the basement) house,From the library departure management。

7.Wind and rain playground、House for the stands,Study management from the School of Basic Education。

8.University Student Activity Center Housing, managed by the Youth League Committee.

9.Library basement、The basement of the training center and the campus road、Plaza、Pond, etc.,Management from the Security Office。

Chapter 3Management and Security

No. 16strip  Forbidden to the existing buildings of the schoolMakeThe following behavior:

1.Demolition and modification of house load -bearing structure、The main structure of the main structure violates the provisions of the safety management of the house;

2.Occupy without authorization、Damage or mobile shared parts、The illegal management regulations of sharing facilities and equipment;

3.Building buildings illegally、Construction,Damage or changing the sky bet games online appearance of the house illegal illegal planning management regulations。

4.It is forbidden to be allowed to be allowed to be allowed,Closer or occupy the fire channel without permission、Damage to fire facilities and equipment illegal fire management regulations,or occupying public stairs privately、Corridor、Hall、Balcony、Public toilets、Tower、outer wall、Greening land and other public places and facilities or surrenderHe uses it.

5.It is forbidden to be allowed to be allowed to be allowed,Putting air conditioning on the top of the house or structure of the house、Solar water water heater、Found the sensitive word "satellite receiver",This word may cause the article to submit to some websites to publish unsuccessful,Suggestion Key inspection。、communication base station、Broadcast equipment, etc., or destroy the construction of the roof waterproof layer and appearance of the building。

6.It is forbidden to be allowed to be allowed to be allowed,Place flammable in the building or around、Explosion、Bian toxic、radioactive items,Emissions are toxic、Harmful substances or noise that exceeds the prescribed standards,Pets of breeding fierce、Large pets and other violated the provisions of public security management。

7.It is forbidden to be allowed to be allowed to be allowed,Set up a stall with the use of use of use without authorization、Opening a company、Catering、Entertainment、Hotels, etc. violating the regulations of industrial and commercial management or affecting the environment、Safety、hygiene。

8. It is forbidden to not be approved by the school,Replace the sky bet games online school's existing buildings by yourself、rental、Lending or as an asset investment、Investment、Mortgage、Investment association and other behaviors。

9.It is forbidden to privately change the use or function of the house.

10.other behaviors prohibited by laws, regulations, and rules.

Article 7  The existing building decoration、Reconstruction, etc. In addition to obtaining planning in accordance with the law、Construction outside the construction license,Demolition and reform of the following structures involving the main structure and fire safety of the building:

1.Demolition foundation, beam, pillar.

2.Demolition and modified concrete shear wall.

3.Digging the floor of the room and the basement and expansion of the basement.

4.Remove the wall connected to the balcony to fight against overturning effects.

5.Demolition and modification has house shock resistance、Non -heavy walls of the overall function of fire prevention。

6.DemolitionDestruction such as changing doors and windows, smashing walls or building wallsFireSafety Behavior.

7.Other behaviors that are harmful to house structure and fire safety.

Article 8  A neighborsUse safety

1.The existing building port management unit shall shall perform the management responsibilities of the use of houses within the scope of management,Important safety issues or hidden dangers discovered should report the logistics management office in a timely manner; discovering the behavior of illegal use of houses may affect the safety of houses,It should be stopped in time。

2.AnyUnits and individuals must not knock on the sky bet login wall at will、Playing、blocking or changing the position of the doors and windows、Move and reform fire protection facilities、Destroy the outer facade, etc.DamageBehavioral behavior of architecture

Chapter 4Maintenance and approval procedures

Article 9  The responsible unit of the existing building maintenance and maintenance is the logistics management office。Logistics Management Office based on the content of maintenanceDevelop a budget and work plan,Daxiu Plan is reported to the school office approval after approval in accordance with relevant regulations。

Article 10  Adjustment function and purpose: The application for adjustment functions or uses will be adjusted to the export management department,After approval and approval of the export management department,Report Live Management Preparation Preparation,If you adjust the matters, you need a school meeting to study,Implementation after the school meeting is approved。

Article 11  Decoration or transformation: Application from the user unit(see attached table),Whether it is renovated or transformed after reviewing the management department for the gastric management department,All decoration and renovation need to provide a stamp construction drawing (not less than four copies) provided by a qualified design unit,Anyone involved in the structure and fire protection content must be qualified by the local construction map review department,With construction conditions。If the project investment is at30More than 10,000 yuanorThe building area is in300above a square meter,It should also be applied to the "Construction Project sky bet games online Construction License" to the local construction authority,Related procedures and materials need to be filed after the logistics management office,Organization.

Chapter 5 Attachment 

Article 12  These measures are responsible for explaining and supervising the implementation of the Logistics Management Office.

Article 13  From the date of announcement of this methodImplement.

 

Jiangsu Certain College of Finance and Accounting Vocational College of Formation Function Trial Form

 

Item names and

Project location

 

 

Drawing Number

 

Change the use of the original building

Functional reasons

 

 

The basis for the establishment of the hospital level

 

£The Party Committee of the hospital   (Meeting Minister[202] No.  No.)

£Dean's Office(Meeting Minister[202] No.  No.)

£Others:                

 

 

Related materials (Design Figure

paper, etc.) Submitting situation

 

Submitter:

receiver:

Submitting time:

Application (use) department opinion

 

 

 

 

The person in charge of the department signs:        year  month  Day

Application (use) department

In charge of leadership opinions

 

 

 

 

Signing in charge of leaders:        year  month  Day

    Description:Projects that are studied and set through the meeting,You need to submit the relevant design drawing according to the requirements of the document (exceed300,000 or more than 300㎡ projects need to submit design drawings and trial,Get the construction permit) in four copies; the person in charge of the application (use) department and the leader on the cover writes "The design of this project and the final effect is reviewed by our department,It fully meets the requirements of our department,Agree with this design drawing construction。"and signature and date.

 


 

 

 

 

 

 

 

 

 

 

 

 

 

 


Sky Bet app